Corrigendum – IV in response to RFB for the work “Supply & Installation of CCTV Cameras (1400nos) in 140 exam centers including cabling, Networking and Maintenance” Dated 14th December 2023

  • Version
  • Download 7
  • File Size 2 MB
  • Create Date February 8, 2024
  • Download

With reference to RFB notice issued vide No IN-DSE-386744-GO-RFB Dated 14th December 2023 for the work "Supply of Tablets for Teacher Attendance Management System" the following modification are hereby issued:-

Refer attachment for details

Sd/-
Project Director
Nagaland Education Project – The Lighthouse (NECTAR)
Kohima, Nagaland