CORRIGENDUM dated 17-11-2024 | Infrastructural development of Lighthouse School Complex – Government Higher Secondary School (GHSS) Phek under Phek District

  • Version
  • Download 5
  • File Size 159 KB
  • Create Date November 17, 2024
  • Download

No. NEP-PMU-157/PROC-LSC-PHK/2024

Corrigendum

In response to   RFP   notice issued vide No IN-DSE-456420-CW-RFB Dated 16th October 2024 for the work “Infrastructural development of Lighthouse School Complex - Government Higher Secondary School (GHSS) Phek under Phek District.” the following modifications are hereby issued:

 

Sl. No. Item Description Quantity as per BoQ Revised Quantity Unit
  CIVIL WORK      
2 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
3 All kind of Soil 2795.41 3167.32 Cum
4 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
5 Ordinary Rock 2345.60 2593.54 Cum
16 Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
17 All works upto Plinth level 430.21 599.91 Cum
18 All works above Plinth level upto floor V level 325.11 354.01 Cum
         
20 Centering and shuttering including strutting, propping etc. and removal of form work for:      
21 Foundations, footings, bases of Columns 839.64 927.78 Sqm
24 Centering and shuttering including strutting, propping etc. and removal of form for      
25 Columns, Pillars, Piers, Abutments, Posts & Struts 2229.65 2309.10 Sqm
26 Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level      
27 Hot Rolled deformed bars 81719.16 97626.16 Kg
  BOYS HOSTEL      
  CIVIL WORK      
559 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
560 All kind of Soil 863.82 906.60 Cum
561 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
562 Ordinary Rock 681.05 709.57 Cum
573 Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
574 All works upto Plinth level 145.74 164.07 Cum
575 All works above Plinth level upto floor V level 101.04 106.31 Cum
577 Centering and shuttering including strutting, propping etc. and removal of form work for:      
578 Foundations, footings, bases of Columns 158.82 177.06 Sqm
581 Centering and shuttering including strutting, propping etc. and removal of form for      
582 Columns, Pillars, Piers, Abutments, Posts & Struts 902.81 925.61 Sqm
  GIRLS HOSTEL      
  CIVIL WORK      
872 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
873 All kind of Soil 1115.99 1158.77 Cum
874 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
875 Ordinary Rock 910.75 939.27 Cum
886 Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
887 All works upto Plinth level 154.78 173.11 Cum
888 All works above Plinth level upto floor V level 96.40 101.67 Cum
890 Centering and shuttering including strutting, propping etc. and removal of form work for:      
891 Foundations, footings, bases of Columns 199.86 214.74 Sqm
894 Centering and shuttering including strutting, propping etc. and removal of form for      
895 Columns, Pillars, Piers, Abutments, Posts & Struts 940.31 963.11 Sqm

 

Sl no Clause Ref: Existing Text Stands amended as
1.        ITB 22.1

 

The deadline for uploading the Bids is:

Date: 18th November 2024

Time: 12:00 Hrs IST

The deadline for uploading the Bids is:

Date: 21st November 2024

Time: 12:00 Hrs IST

2.        ITB 25.1 The online Bid opening of Technical Parts of Bids shall take place at: Conference Room, PMU, Nagaland Education Project

 

Date: 18th November 2024

Time: 12:30 Hrs IST

The online Bid opening of Technical Parts of Bids shall take place at: Conference Room, PMU, Nagaland Education Project

 

Date: 21st November 2024

Time: 12:30 Hrs IST

 

IMPORTANT INSTRUCTION:

The revised quantities cannot be updated in the live BoQ in the portal. Bidders are instructed to enclose the rates for the additional quantities in the ANNEXURE format and enclosed along with the financial letter of bid. The total amount should be reflected in the Letter of Bid-Financial Bid and the same will be considered as the final bid price for evaluation.

Bid Security should be valid up-to 2nd May 2025, (165 days from the date of original bid submission deadline, i.e., 18th November 2024)

Note: The other terms and conditions of the RFP remain unchanged

Sd/-
Project Director
Nagaland Education Project
Department of School Education
Kohima, Nagaland

 

ANNEXURE

 

Financial Bid Particulars Amount
Total Amount as per published BoQ (A)  
Total Amount for additional quantities (B)  
Total Financial Bid Price (C=A+B)  
Total Financial Bid Price (in words):

 

 

BOQ for additional quantities (B)

Sl. No. Unit Item Description Additional Quantity Unit Rate Total Amount
ACADEMIC BLOCK      
2   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
3 Cum All kind of Soil 371.91    
4   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
5 Cum Ordinary Rock 247.94    
16   Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
17 Cum All works upto Plinth level 169.70    
18 Cum All works above Plinth level upto floor V level 28.90    
20   Centering and shuttering including strutting, propping etc. and removal of form work for:      
21 Sqm Foundations, footings, bases of Columns 88.14    
24   Centering and shuttering including strutting, propping etc. and removal of form for      
25 Sqm Columns, Pillars, Piers, Abutments, Posts & Struts 79.45    
26   Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level      
27 Kg Hot Rolled deformed bars 15907.00    
           
BOYS HOSTEL      
559   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
560 Cum All kind of Soil 42.78    
           
561   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
562 Cum Ordinary Rock 28.52    
           
573   Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
574 Cum All works upto Plinth level 18.33    
575 Cum All works above Plinth level upto floor V level 5.27    
           
577   Centering and shuttering including strutting, propping etc. and removal of form work for:      
578 Sqm Foundations, footings, bases of Columns 18.24    
           
581   Centering and shuttering including strutting, propping etc. and removal of form for      
582 Sqm Columns, Pillars, Piers, Abutments, Posts & Struts 22.80    
           
GIRLS HOATEL      
872   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
873 Cum All kind of Soil 42.78    
           
874   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
875 Cum Ordinary Rock 28.52    
           
886   Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
887 Cum All works upto Plinth level 18.33    
888 Cum All works above Plinth level upto floor V level 5.27    
           
890   Centering and shuttering including strutting, propping etc. and removal of form work for:      
891 Sqm Foundations, footings, bases of Columns 14.88    
           
894   Centering and shuttering including strutting, propping etc. and removal of form for      
895 Sqm Columns, Pillars, Piers, Abutments, Posts & Struts 22.80