CORRIGENDUM dated 03-02-2025 | Supply & and Installation of CCTV system (1463 nos) in 142exam centres including cabling and networking

  • Version
  • Download 1
  • File Size 269 KB
  • Create Date February 4, 2025
  • Download

NEP-PMU-41/PROC-CCTV/2023                                                              
Dated: Kohima, the 3rd Feb’ 2025

CORRIGENDUM

In reference to   RFB   notice issued vide no IN-DSE-460822-GO-RFB Dated 16th January 2025 for the work “Supply & and Installation of CCTV system (1463 nos) in 142exam centres including cabling and networking” the following modifications are hereby issued:

 

Sl no Clause Ref: Existing Text Stands amended as
1 RFB Page 107 Section VII-Schedule of requirement. Technical Specification Camera: Certifications b) ISO 20000 Deleted

 Note:

  • The other terms and conditions of the RFB remain unchanged

 

 

(AVELU RUHO) NCS
Deputy Project Director
Nagaland Education Project (NECTAR)
Kohima, Nagaland