CORRIGENDUM dated 03-02-2025 | Supply & and Installation of CCTV system (1463 nos) in 142exam centres including cabling and networking
- Version
- Download 1
- File Size 269 KB
- Create Date February 4, 2025
- Download
NEP-PMU-41/PROC-CCTV/2023
Dated: Kohima, the 3rd Feb’ 2025
CORRIGENDUM
In reference to RFB notice issued vide no IN-DSE-460822-GO-RFB Dated 16th January 2025 for the work “Supply & and Installation of CCTV system (1463 nos) in 142exam centres including cabling and networking” the following modifications are hereby issued:
Sl no | Clause Ref: | Existing Text | Stands amended as |
1 | RFB Page 107 Section VII-Schedule of requirement. Technical Specification | Camera: Certifications b) ISO 20000 | Deleted |
Note:
- The other terms and conditions of the RFB remain unchanged
(AVELU RUHO) NCS
Deputy Project Director
Nagaland Education Project (NECTAR)
Kohima, Nagaland