CORRIGENDUM dated 17-11-2024 | Infrastructural development of Lighthouse School Complex – Government Higher Secondary School (GHSS) Satakha under Zunheboto District

  • Version
  • Download 9
  • File Size 159 KB
  • Create Date November 17, 2024
  • Download

No. NEP-PMU-158/PROC-LSC-ZBT/2024

Corrigendum

In response to   RFP   notice issued vide No IN-DSE-456421-CW-RFB Dated 16th October 2024 for the work “Infrastructural development of Lighthouse School Complex - Government Higher Secondary School (GHSS) Satakha under Zunheboto District.” the following modifications are hereby issued:

 

BoQ Sl. No. Item Description Quantity as per BoQ Revised Quantity Unit
  ACADEMIC BLOCK      
  CIVIL WORK      
2 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
3 All kind of Soil 2427.80 2738.75 Cum
4 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
5 Ordinary Rock 749.20 956.50 Cum
16 Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
17 All works upto Plinth level 417.30 572.97 Cum
18 All works above Plinth level upto floor V level 297.17 316.54 Cum
20 Centering and shuttering including strutting, propping etc. and removal of form work for:      
21 Foundations, footings, bases of Columns 971.64 1066.62 Sqm
24 Centering and shuttering including strutting, propping etc. and removal of form for      
25 Columns, Pillars, Piers, Abutments, Posts & Struts 2066.25 2152.35 Sqm
26 Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level      
27 Hot Rolled deformed bars 73639.03 87458.03 Kg
  BOYS HOSTEL      
  CIVIL WORK      
528 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
529 All kind of Soil 1033.61 1076.39 Cum
530 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
531 Ordinary Rock 445.07 473.59 Cum
542 Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
543 All works upto Plinth level 109.84 128.17 Cum
544 All works above Plinth level upto floor V level 96.56 101.84 Cum
546 Centering and shuttering including strutting, propping etc. and removal of form work for:      
547 Foundations, footings, bases of Columns 154.32 172.56 Sqm
550 Centering and shuttering including strutting, propping etc. and removal of form for      
551 Columns, Pillars, Piers, Abutments, Posts & Struts 775.31 798.11 Sqm
  GIRLS HOSTEL      
  CIVIL WORK      
844 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
845 All kind of Soil 343.61 386.39 Cum
846 Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
847 Ordinary Rock 215.07 243.59 Cum
858 Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
859 All works upto Plinth level 111.99 130.32 Cum
860 All works above Plinth level upto floor V level 96.40 101.67 Cum
862 Centering and shuttering including strutting, propping etc. and removal of form work for:      
863 Foundations, footings, bases of Columns 154.32 169.20 Sqm
866 Centering and shuttering including strutting, propping etc. and removal of form for      
867 Columns, Pillars, Piers, Abutments, Posts & Struts 775.31 798.11 Sqm

 

Sl no Clause Ref: Existing Text Stands amended as
1.        ITB 22.1

 

The deadline for uploading the Bids is:

Date: 18th November 2024

Time: 12:30 Hrs IST

The deadline for uploading the Bids is:

Date: 21st November 2024

Time: 1230 Hrs IST

2.        ITB 25.1 The online Bid opening of Technical Parts of Bids shall take place at: Conference Room, PMU, Nagaland Education Project

 

Date: 18th November 2024

Time: 13:00 Hrs IST

The online Bid opening of Technical Parts of Bids shall take place at: Conference Room, PMU, Nagaland Education Project

 

Date: 21st November 2024

Time: 1300 Hrs IST

 

IMPORTANT INSTRUCTION:

The revised quantities cannot be updated in the live BoQ in the portal. Bidders are instructed to enclose the rates for the additional quantities in the ANNEXURE format and enclosed along with the financial letter of bid. The total amount should be reflected in the Letter of Bid-Financial Bid and the same will be considered as the final bid price for evaluation.

Bid Security should be valid up-to 2nd May 2025, (165 days from the date of original bid submission deadline, i.e., 18th November 2024)

Note: The other terms and conditions of the RFP remain unchanged

Sd/-
Project Director
Nagaland Education Project
Department of School Education
Kohima, Nagaland

 

ANNEXURE

 

Financial Bid Particulars Amount
Total Amount as per published BoQ (A)  
Total Amount for additional quantities (B)  
Total Financial Bid Price (C=A+B)  
Total Financial Bid Price (in words):

 

 

BOQ for additional quantities (B)

Sl. No. Unit Item Description Additional Quantity Unit Rate Total Amount
ACADEMIC BLOCK      
2   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
3 Cum All kind of Soil 310.95    
           
4   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
5 Cum Ordinary Rock 207.30    
           
16   Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
17 Cum All works upto Plinth level 155.67    
18 Cum All works above Plinth level upto floor V level 19.37    
           
20   Centering and shuttering including strutting, propping etc. and removal of form work for:      
21 Sqm Foundations, footings, bases of Columns 94.98    
           
24   Centering and shuttering including strutting, propping etc. and removal of form for      
25 Sqm Columns, Pillars, Piers, Abutments, Posts & Struts 86.10    
           
26   Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above plinth level      
27 Kg Hot Rolled deformed bars 13819.00    
           
BOYS HOSTEL      
528   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
529 Cum All kind of Soil 42.78    
           
530   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
531 Cum Ordinary Rock 28.52    
           
542   Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
543 Cum All works upto Plinth level 18.33    
544 Cum All works above Plinth level upto floor V level 5.28    
           
546   Centering and shuttering including strutting, propping etc. and removal of form work for:      
547 Sqm Foundations, footings, bases of Columns 18.24    
           
550   Centering and shuttering including strutting, propping etc. and removal of form for      
551 Sqm Columns, Pillars, Piers, Abutments, Posts & Struts 22.80    
           
GIRLS HOSTEL      
844   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
845 Cum All kind of Soil 42.78    
846   Earth work in excavation by mechanical means (Hydraulic excavator/Manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 Sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge      
847 Cum Ordinary Rock 28.52    
858   Providing and laying in position ready mixed M25 grade concrete for RCC work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixture, manufactured as per Mix Design of specified Grade for RCC work, including pumping of RMC from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per 15-9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. (NOTE: Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately)      
859 Cum All works upto Plinth level 18.33    
860 Cum All works above Plinth level upto floor V level 5.27    
862   Centering and shuttering including strutting, propping etc. and removal of form work for:      
863 Sqm Foundations, footings, bases of Columns 14.88    
866   Centering and shuttering including strutting, propping etc. and removal of form for      
867 Sqm Columns, Pillars, Piers, Abutments, Posts & Struts 22.80