CORRIGENDUM dated 23-10-2024 | Infrastructural development of Lighthouse School Complex – Government Higher Secondary School (GHSS) Longleng Town (Bautung Phom Memorial) under Longleng District
- Version
- Download 5
- File Size 129 KB
- Create Date October 23, 2024
- Download
NEP-PMU-152/PROC-LSC-LON/2024/734
CORRIGENDUM
In response to RFB notice issued vide no IN-DSE-454219-CW-RFB Dated 8th October 2024 for the work “Infrastructural development of Lighthouse School Complex - Government Higher Secondary School (GHSS) Longleng Town (Bautung Phom Memorial) under Longleng District.” the following modifications are hereby issued:
Sl no | Clause Ref: | Existing Text | Stands amended as |
1 | Page 3 | 4. Further the bid evaluation will follow Rated Criteria as per World Bank’s Procurement Regulations Para 3 (Annex X) with 80% weightage to the financial parameters and balance 20% to the Technical and other parameters related to Environmental and Social aspects. | 4. Further the bid evaluation will follow Rated Criteria as per World Bank’s Procurement Regulations Para 3 (Annex X) with 70% weightage to the financial parameters and balance 30% to the Technical and other parameters related to Environmental and Social aspects. |
2 | BDS ITB 32.2 | The following parameters will be considered for rated criteria with 20% technical weightage and 80% financial weightage for evaluation | The following parameters will be considered for rated criteria with 30% technical weightage and 70% financial weightage for evaluation |
3 | BDS ITB 42.1 | The weight to be given for cost is: 0.8 | The weight to be given for cost is: 0.7 |
4 | Table in Page no 6 of the RFB | Estimated cost
(Rs.) 11.52 Cr. |
Estimated cost
(Rs.) 11.47 Cr. |
5 | Table in Page no 6 of the RFB and ITB 19.1 | Bid Security: 11.52 Lakh | Bid Security: 11.47 Lakh |
Note:
- The other terms and conditions of the RFB remain unchanged
Sd/-
(AVELU RUHO) NCS
Deputy Project Director
Nagaland Education Project (NECTAR)
Kohima, Nagaland